The first thing you must do when installing cylinder heads is to ensure both the block and head surfaces areĬompletely clean from dust, oil, and any debris. To ensure all pistons move smoothly in and out of their cylinders and nothing binds.ĭodge Challenger 6.1L OHV Connecting Rod Torque Specs : 15 ft-lbs + 90° Rod bolts to 10 ft-lbs and then to 15 ft-lbs follwed by an additional 90 degree turn for each bolt. Once installed you can match the connecting rod caps with the correct rods and start to torque the connecting Or mark is facing the front of the engine and that you don't scratch the cylinder. The piston can now be lowered into the cylinder, make sure the dot Once the rings have been installed you can now fit the connecting rod bearings into the end capsĪnd lube them up with oil or lithium grease. Each ring manufacturer is different so be sure to check for your The instructions given with the new rings. Positions, this can be determined by looking at Make sure to put the correct rings in the correct Not to stretch the rings or break them during installation. To install the pistons and connecting rods you must first install the piston rings into each piston.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |